All Hull roadworks coming up from February 13 2023
Hull will see further road closures over the next week, with Apple TV crews continuing to film in various locations around the Old Town. Filming for ‘Blitz’ will see Alfred Gelder Street and Scale Lane closed next week, as well as others. This, combined with the ongoing developments on the A63 could mean that motorists in Hull will face some disruption over the next week. Production work on the Apple TV drama is scheduled to conclude on Tuesday, February 14, meaning that the state of Hull’s roads should improve towards the end of the week. Below is a full list of all the affected roads. Read more: What happened in Hall Road crash that claimed the lives of two young men Planned roadworks: Air Street, off Bankside: February 20 to March 10 – Gas main replacement. Road closure. Air Street closed at roundabout. Bank Side / Wincolmlee to remain open under two-way signals – Northern Gas Network (NGN) Alfred Gelder Street, city centre: February 12 – Film production. Road closed between Lowgate and Quay Street from 6am to 10am – Filming Beverley Road to Brunswick Arcade: October 4 21 to April 1, 23 – Brunswick Arcade demolition. Lane closures Beverley Road: February 23 – Provide and fix new cover under the bridge near De Grey Street. Two-way signals 9.30pm to 11.30pm – Yorkshire Water Cavendish Road, east Hull: February 13 to March 26 – Reconstruct existing footpath. Four-way lights (manually operated 7am to 7pm). Work to be done in phases to reduce the amount of footpath closed. Footpath on op
SEE FULL ARTICLE