The roadworks happening in Hull this week and beyond
Hull Daily Mail Icon News Hull & East Yorkshire News Traffic & Travel Need to know A number of routes across the city will be affected The underpass section of the A63 Castle Street scheme, pictured in January 2026(Image: Hull Live) Here are the current and upcoming roadworks taking place across the Hull area A63 improvement scheme – St James Street to Market Place until 31/05/26. Major A63 Improvement scheme – full infrastructure change, operating under a Development Control Order which gives the powers to National Highways to implement this scheme. Lane and road closures until completion of scheme. (National Highways) Alfred Gelder Street until 01/02/26. Section 50 connection for District Heat. Two-way signals at the junction with Ghandi Way. Off-peak working only. (Hull City Council) Anlaby Road until 10/02/26. Replacing gas pipe at the junction of Anlaby Road to outside 700. Road closure in place. (Northern Gas Networks) Beverley Road until 30/01/26. Replacing gas pipe at the junction of Fountain Road to Station Drive. Contraflow in place. (Northern Gas Networks) Calvert Lane until 30/01.26. Replacing gas pipe at the junction of Anlaby Road. Multi-way signals in place. (Northern Gas Networks) Chapel Lane 26/01/26- 13/01/26. Mains connection at the junction of High Street. Road closure in place. Phased works, High Street to be open while Chapel Lane is closed. Weekday working only. Site clear at the weekends. (Northern Power Grid) Cottingham Road/Hall Road Roundabout 02/02/26-13/02/26. Carriageway resurfacing delivered in two phases, maintaining traffic flow between Hall Road and Fairfax Avenue with temporary signals. Throughout the durations of these works, access to Hotham Road North and Cottingham Road on both sides of the roundabout will be closed. (Hull City Council) Derringham Street until 29/01/126. Emergency works to repair burst water main opposite numb…
SEE FULL ARTICLE